Training & seminars
Module 4 - Good (Quality Control) Laboratory Practices (G(QC)LPs) (23 – 24 April 2018) – 2 day Course
23 April 2018 – 24 April 2018
Aim: To develop a broad understanding of the types and sources of contamination; and to analyze and assess the major risks topharmaceuticals and the practical control methods which are used to minimize and correct contamination problems.
Day 1 AM ►Introduction to Contamination Control and why it is critical to product quality
PM ►Microbiological Aspects of Manufacturing including routes of contamination. Identify the key controls within a manufacturing facility
Day 2 AM ►Cleaning and Sanitation
PM ►HVAC and Controlled Environments – control & qualification
Day 3 AM ►Environmental Monitoring Programs
PM ►Control of Water Systems